Padthaway Engineering were engaged on the basis of our capability to complete works in extreme conditions. This project was disaggregated from the broader line project due to the extreme nature of the site in terms of water table, ground conditions, soil type and topography/access.
Scope of works to remediate all 4 x footings consistent of the client specifications.
Site specific challenges:
Compliance and Pre-Construction:
Construction:
Padthaway Engineering were engaged on short notice and on the basis of our capability to complete drilling works in extreme conditions. Padthaway Engineering delivered the works on the eve of the Christmas break inside 1 x working week and with the added complexity of inclement weather and limited line outages
Site specific challenges:
Project Execution
Compliance and Pre-Construction:
Construction:
Padthaway Engineering were engaged to complete ~57 tower legs including minor and major remediation's to the new client specifications. Footings remediation's to extend life of towers by ~20 years.
Site specific challenges:
Project Execution
Compliance and Pre-Construction:
Construction:
Padthaway Engineering were commissioned to complete multiple access track remediations. Unprecedented rainfall rendered multiple transmission tower worksites unreachable due to severe ruts, washed out areas and bogs. Existing tracks were first cleared of overgrown vegetation prior to being excavated, boxed and where required Geomesh dropped to prevent further subsidence. New tracks were then constructed to NSW RFS and National Parks and Wildlife Services specifications. Tracks were crowned and cambered with cross banks constructed to manage runoff. Works were competed within the time and budget expectations of the client.
Poor condition of existing tracks
Steep gradient
Biohazard controls required
Waterlogged sites with ongoing runoff impeding works
Landowner requirements/specifications